August 12, 2009 (Early)
The new board!

The video board arrives and is prepared for installation.

One of the two sections is lifted to be placed on the other.

It was a very delicate operation.

The two pieces were attached and the wiring completed ...

... then the board was lifted from the truck and put at ground level.

After some final work, the board was lifted up ...

... and over ...

... and into place on the structure.

Workers then secured the board to the structure.

The board from up close ...

... and from much further away (on the walkway into the Stadium).