| Home (of the Blue Devils) |
|
|
| How You Can Help! |
|
|
| The Renovations |
|
|
| Photo Galleries / 2009 |
|
|
Photo Galleries / 2008
| April 30, 2008 |
|
|
| May 2, 2008 |
|
|
| May 6, 2008 |
|
|
| May 9, 2008 |
|
|
| May 12, 2008 |
|
|
| May 13, 2008 |
|
|
| May 14, 2008 |
|
|
| May 19, 2008 |
|
|
| May 23, 2008 |
|
|
| May 28, 2008 |
|
|
| May 29, 2008 |
|
|
| June 2, 2008 |
|
|
| June 4, 2008 |
|
|
| June 10, 2008 |
|
|
| June 11, 2008 |
|
|
| June 13, 2008 |
|
|
| June 18, 2008 |
|
|
| June 19, 2008 |
|
|
| June 23, 2008 |
|
|
| June 26, 2008 |
|
|
| July 2, 2008 |
|
|
| July 7, 2008 |
|
|
| July 8, 2008 |
|
|
| July 9, 2008 (Early) |
|
|
| July 9, 2008 (Late) |
|
|
| July 11, 2008 |
|
|
| July 13, 2008 |
|
|
| July 15, 2008 |
|
|
| July 16, 2008 |
|
|
| July 17, 2008 |
|
|
| July 19, 2008 |
|
|
| July 21, 2008 (Early) |
|
|
| July 21, 2008 (Late) |
|
|
| July 23, 2008 |
|
|
| Aug. 4, 2008 |
|
|
| Aug. 13, 2008 |
|
|
| Aug. 15, 2008 |
|
|
| Aug. 21, 2008 |
|
|
|
| Who was John Sulsberger? |
|
|
| Building the Stadium-1964 |
|
|
| Stadium Facts |
|
|
| The Latest News |
|
|
| Contact Us |
|
|
| Site Map |
|
|
|
JUNE 11, 2008 Down the drains!
One worker excavates the ditch in which the larger drain pipe is being placed, while another using a small loader brings gravel to fill where pipe has already been installed. A worker stands in the trench to watch the digging continue down the visitors sideline. A worker waits to measure the grade level of the trench to make sure it is set exactly where it should. With drain pipe waiting nearby, the trench is measured for the correct depth. Workers prepare to settle another large piece of drainage pipe into place. |
|